general building plan pnap

 · PDF 檔案

General Building Contractors, Registered Specialist Contractors and Registered Minor Works Contractors in carrying out their statutory supervisory duties. The strategy on site auditing helps to bring to light structural safety-related irregularities or

 · PDF 檔案

^ Corresponding legend in approved plan should be specified where applicable. % Part C of Certificate of Accepted Building Materials and Products should be completed by RSC(V) + For explanatory notes on signing capacity, please refer to Appendix B of +

www.archsd.gov.hk

 · PDF 檔案

TECHNICAL MEMORANDUM FOR SUPERVISION PLANS 2009 E237 CONTENTS Page PART I PRELIMINARY 1. Citation and commencement 1 2. Application and scope 1 3. Interpretation 2 PART II THE SUPERVISION PLAN 4. General principles 7 5.

www.dsd.gov.hk

PPT – Building Plan Submission System Review PowerPoint presentation | free to view – id: 8c60c-ZDc1Z The Adobe Flash plugin is needed to view this content Get the plugin now

 · PDF 檔案

This Code of Practice, hereafter referred to as the “COP”, is issued by the Communications Authority (CA) in consultation with the Network Operators and the building industry. It encourages building design and construction professionals to design new buildings

 · PDF 檔案

Code of Practice for Energy Efficiency of Building Services Installation Contents BEC 2018 – ii – EMSD 6.4 System Load Calculation 23 6.5 Separate Air Distribution System for Process Zone 23 6.6 Air Distribution Ductwork Leakage Limit 24 6.7 Air

The Planning Department was established in 1990 with a mission to make Hong Kong a better place to live and work in. We are striving to build Hong Kong into a liveable, competitive and sustainable ‘Asia World City’. | 規劃署於一九九零年成立,肩負起使香港成為更

 · PDF 檔案

Manual for Design and Detailing of Reinforced Concrete to September 2013the Code of Practice for Structural Use of Concrete 2013 Contents 1.0 Introduction 2.0 Some highlighted aspects in Basis of Design 3.0 Beams 4.0 Slabs 5.0 Columns 6.0 Beam

ADM-6 or PNAP 79 Computer Programs for Use in Structural and Geotechnical Design ADM-7 or PNAP 104 Geotechnical Information Unit APP-15 or PNAP 55 Site Formation – Temporary or Permanent Filling Work (Appendix A) APP-17 or PNAP 61 Rock Faces – Building (Planning) Regulations 27

More than one quarter of the total solid waste disposed of in landfills is generated from building construction. Construction waste Demolition waste Trip-ticket system Waste management plan Appendix A PNAP 243 ADV-19 Trip Ticket System (i) At the

 · PDF 檔案

– 3 – building plan is submitted to the Building Authority (BA) for approval. During the consultation, some stakeholders pointed out that the design of many features relating to energy efficiency of a building would still be at a preliminary stage when its general

 · PDF 檔案

GENERAL REQUIREMENTS 4. It is necessary to demonstrate compliance of EVA requirements on all general building plan submissions. The technical specifications of an EVA that cater for FSD’s operational needs in virgin and redevelopment sites as.

 · PDF 檔案

Code of Practice No. 101 for Distribution Substation Design Page 5 Version 12.0 June 2012 LV fuse cutout unit for LV capacitor – 1000mm in front of cutout. 4.4 Foundations 4.4.1 The transformer foundation/plinth shall be capable of supporting a minimum

 · PDF 檔案

be affected by the works. Featuring a spherical head and a plated body that minimize damage to the building, the wall-mounted marker is installed around the external facade of the building. To adequately monitor the settlement of Existing Building Structure

This seminar is tailor-made for building professionals, particularly those Technically Competent Persons (TCP) of the Supervision Plan System under the Buildings Ordinance, to refresh them with basic knowledge on the pre-requisites of jointing aspects and to

 · PDF 檔案

external to the outer building wall/boundary, but within the designated property line (as shown in the Building Plan approved by the Buildings Authority) under the jurisdiction of the responsible person(s), and within which inhabitation is strictly prohibited.

 · PDF 檔案

Layout Plan Landscaping Plan 1 LAO PN 1/1994 Processing of General Building Plans under Lease Conditions 2 LAO PN 1/1999 Design, Disposition and Height Clause under Lease Conditions 3 LAO PN 5/2002 Processing Time for Master Layout Plan, General

 · PDF 檔案

The approved general building plans of this development are not subject to the requirements stipulated in the Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-151 issued by the Building

 · PDF 檔案

General Building Contractor {RGBC} and Registered Specialist contractor {RSC}) in Hong Kong construction industry (in Private Sector). 3. Point out the regulation, law, document submission, and monitoring system (government, owner, consultant, and5.

Corporate Video 2019 (Cantonese version) has been launched. Welcome for viewing please. (English version is coming soon)

 · PDF 檔案

International Journal on Engineering Performance-Based Fire Codes, Volume 6, Number 4, p.223-229, 2004 223 PERFORMANCE-BASED FIRE SAFETY DESIGN IN HONG KONG S.C. Tsui Department of Building Services Engineering, The Hong Kong

 · PDF 檔案

Measuring BH • Top of a building – highest level of the main roof • Base of a building – mean site formation level • Averageof the sum of the highest and lowest formation levels of land on which any part of the building stands including basement floors • Measurement of

主頁 關於我們 歡迎辭 抱負、使命及信念 部門組織 年報 服務目標及成就 財務資料 水務里程及水務古蹟 水務諮詢委員會 水務署義工隊 年度開放數據計劃 核心工作 全面水資源管理策略 水資源 供水系統的運作及保

 · PDF 檔案

Latest information on breakdown of GFA concessions as shown on the general building plans submitted to and approved by the Independent Checking Unit (ICU) of the Office of the Permanent Secretary for Transport and Housing (Housing) prior to the printing of

 · PDF 檔案

2009/6/29 7 2.5 Submission of Drawings Building Plan submission Working drawing submission Method of control to be stated-Method A, B, or C Layout – Air handling equipments to be shut down should be coloured. VAC control zones should be indicated.

CFA & GFA Construction Floor Area (CFA) generally covers areas of a building that are to be constructed and are measured to the outside face of the external walls of the building and includes all lift shafts, stairwells, car park, plant rooms and the like.

The Hong Kong Institute of Landscape Architects (HKILA) supports the government in setting up a dedicated office to strengthen tree management works in order to safeguard public safety, improve tree care and enhance vegetation quality in the city.

 · PDF 檔案

Planning Buildings for a High-Rise Environment in Hong Kong Lawrence Wai-chung Lai , Daniel Chi-wing Ho at General Building Plan Stage — Building (Administration) Regulation 8(l)(ba) PNAP 79 Computer Programmes for Use in Structural June9 199 Issue

Building Surveying Division General Practice Division Land Surveying Division Planning and Development Division Property and Facility Management Division Quantity Surveying Division Young Surveyors Group Head Office Rm 1205, 12/F, Wing On Centre

Building Information Modelling and Geographic Information System Construction Product Certification Information Platform on Recyclable Non-inert Construction and Demolition Waste Performance Assessment Prefabrication in Housing Blocks Use of Hydraulic

 · PDF 檔案

Purpose of site formation is to prepare a piece of land in order to: • Accommodate building/s or other facilities which will be placed within the area. Clearance of the site including the removal of buildings or unwanted structures, shrubs and trees, surface soil and

Hoarding for construction sites – Designing Buildings Wiki – Share your construction industry knowledge. Hoarding is a temporary structure of solid construction, erected around the perimeter of construction sites to shield them from view and prevent unauthorised access. It is an important component in ensuring health and safety, for site workers, visitors and the general public and can also be

 · PDF 檔案

This Code of Practice should be titled ‘Code of Practice for the Electricity (Wiring) Regulations’ hereinafter referred as the ‘CoP’. The CoP is published to give general technical guidelines on how the statutory requirements of the Electricity (Wiringreferred as

Requirements for an Excavation and Lateral Support Plan Building (Administration) Regulation 8(1)(bc). Practice Note for Authorized Persons and Registered Structural Engineers (PNAP) 148. Building Authority, Hong Kong.

 · PDF 檔案

general, rainwater and uncontaminated cooling water and the like should be discharged to published by the Building Authority. The drainage plan submission should include detailed drawings and design calculations. (vii) Drainage serving the open area of a

主頁 關於本會 新聞中心 成為會員 會員專區 搜尋會員 專業發展 出版刊物 聯絡我們 網頁指南 免責聲明 相關網址 下載區 建築

 · PDF 檔案

1/2019 along with the General Building Plan (GBP) submission if I am required to do so as a planning approval condition? Who may prepare the LMP/LP submission? A2: Under the new streamlined arrangement, prior to or at the time of GBP submission,

 · PDF 檔案

12. PNAP APP-105 Water Seepage (formerly PNAP 230) – link 13. PNAP APP-099 Flushing Volume for Flushing Cisterns (formerly PNAP 220) – link 14. PNAP APP-006 Shops and Department Stores – Building (Standards of Sanitary Fitments, Plumbing15.

 · PDF 檔案

General 12.3.1.1 The preparation of the LVIA is based on the EIAO GN No. 8/2010 “Preparation of Landscape and Visual Impact Assessment under the EIAO” for evaluation of proposed development. Section 2 of EIA describes the details of the Project and this

 · PDF 檔案

Beware! The Building Authority is Changing the Rule of the Game in General Building Plans Approval Process, but Did Not Conduct Any Consultation in Advance From 21 October 2010, a developer is required to prove that it owns the land or has a realistic

The Area Weighting Method shall be applied in the assessment to cater for a mix of building types in complex premises which consists of residential, clubhouse, retail and/or car park for EU and IEQ credits. Under BEAM Plus Version 1.1, a building type with area

 · PDF 檔案

Latest information on breakdown of GFA concessions as shown on the general building plans submitted to and approved by the Independent Checking Unit (ICU) of the Office of the Permanent Secretary for Transport and Housing (Housing) prior to the printing of the

Scribd es el sitio social de lectura y editoriales más grande del mundo.

Gross floor area (GFA) in real estate is the total floor area inside the building envelope, including the external walls, and excluding the roof. Definitions of GFA, including which areas are to be counted towards it and which areas aren’t, vary around the world. Adding to

General Building Plan, defined under Hong Kong Buildings Ordinance GFA Gross Floor Area PlanD Planning Department, HKSAR Government PNAP Practice Notes for Authorized Persons, Registered